Transforming Today's Classrooms
Investing in Excellence
What's changed is everything around them.
Nearly 900 Mustangs now walk these halls each day learning, collaborating, and preparing for college and life in spaces built for a different generation of learners. The classrooms have held up admirably. But they were never designed for the way students learn now.
The Classroom Renovation Project: An Investment in Tomorrow's Leaders that will change by modernizing the heart of our campus so every Mustang learns in a space as forward-looking as the education happening inside it.
Why This Project Matters
$20M
Total Project Investment
A comprehensive $20 million renovation of the Main School Building.
55,000
Square Feet Transformed
Space where students learn and grow.
28
Classrooms Rebuilt
Every one of our 28 classrooms will be fully rebuilt inside and out.
3
New Classrooms
We are creating 3 new additional classrooms and learning spaces.
1962
Year Building Was Built
A legacy of academic excellence and faith-centered education for 60+ years.
The Need
Learning Spaces Ready
for Renewal
Bishop McNamara has provided an exceptional Catholic education rooted in faith, academic excellence, and service. While our students continue to thrive, many of the classrooms where they learn have remained largely unchanged since they were first built.
Today, nearly 900 students learn in spaces that no longer reflect the innovation, collaboration, and technology that define a modern college-preparatory education. The Classroom Renovation Project will renew 28 learning spaces and create 3 new learning spaces across 55,000 square feet so the rooms match the education happening inside them.

Six Ways We Will Transform Our Classrooms
From new finishes and climate control to modern technology, here is what your support will renew in all 28 learning spaces and create in the 3 new learning spaces.
Renewed Interiors
Replacing original 1962 finishes, fixtures, and interior elements in the 100/200 Hall with durable materials built for decades of daily use.
Climate Control
New energy-efficient central air conditioning and heating for balanced, consistent temperatures in 28 renewed spaces and 3 new spaces.
Modern Technology
Upgraded wiring and high-speed connectivity to support STEM instruction, digital smart boards, and network access for all devices.
Efficiency and Safety
Smart lighting and structural safety updates that cut campus energy use and strengthen building security.
Accessibility
Layout improvements so every student, educator, and returning alumnus can move through the hall with ease.
Flexible Learning Spaces
Flexible environments and modular furniture that let classrooms evolve alongside student collaboration needs.
Timeline
-
October 2026
Campaign kickoff
-
December 2026
Construction begins, classes move to swing space
-
January 2027
Groundbreaking Ceremony
-
Throughout 2027
South addition and reno
-
January 2028
Project complete
Together, We're Building the Future
CAMPAIGN PROGRESS
Raised through private philanthropy from our alumni, families, and charitable foundations.
Imagine the Possibilities!
The Classroom Renovation Project will transform more than 55,000 square feet into bright, welcoming spaces designed for today's learners and tomorrow's leaders.



